Heavy gensets and containerised generators can be moved through production using MasterMover electric tugs enabled with patented MultiLink technology. MultiLink allows multiple tugs to work in unison to move large, heavy loads with total precision and control, even into tight bays - remote controlled by a single operator and no license needed.
By switching to electric tugs, gensets and containerised generators weighing up to 300,000kg can be easily manoeuvred between assembly, testing, paint, inspection, and dispatch without the need for an overhead crane or waiting on forklift availability.